Today they prepared for sheet rock.
Because the trusses were wrong they had to shim them down. They also had to re-locate the electrical line that was in the existing wall.
At the start of the video I had mentioned how I would have ran the wire. At the end of the day I was upset when I came home to find what I did!
How is it that the general contractor doesn't check these things to make sure everything works. Why should I be the one to have to find these things and get them done right? Didn't I hire you to do this?
What am I paying you for?
No comments:
Post a Comment